c5,7

Revised:  August 10, 2004.



Revised:  October 26, 2004.


summary="layout">

2a35,36
summary="layout">doprint
5a40,41
cellpadding="0" summary="layout">

9c45
member of the IBM TotalStorage Virtualization Family of solutions. The
member of the IBM TotalStorage Open Software Family of solutions. The

2,57c58,63

The IBM 2145 SAN Volume Controller Model 4F2 has a 2.4 GHz, 2-way
Intel Prestonia processor, 4 GB high speed memory, redundant
Uninterruptable Power Supplies (UPSs), 36 GB hard drive, and language
support.




The IBM 2145 SAN Volume Controller Model 4F2 has dual 2.4 GHz, 2-way
Intel Prestonia processors, 4 GB high speed memory, redundant
Uninterruptable Power Supplies (UPSs), and language support.


alt="Back to top"/>Back to top


0c66,67

cellpadding="0" summary="layout">


7,78c84,86






alt="Back to top"/>Back to top

1c89,90

cellpadding="0" summary="layout">


9,93c98,102
Engine is a node; two nodes make up a node pair (I/O Group), and one or
two I/O Groups constitute a SAN Volume Controller cluster. The cluster
is scalable from one to two node pairs (I/O Groups) and supported by dual
read/write cache. This design is intended to avoid single points of
failure and support concurrent maintenance.
Engine is a node; two nodes make up a node pair (I/O Group), and one to
four I/O Groups constitute a SAN Volume Controller cluster. The cluster
is scalable from one to four node pairs (I/O Groups) and supported by
dual read/write cache. This design is intended to avoid single points
of failure and support concurrent maintenance.

31a141,146

If the master console is used to manage more than two I/O Groups
(4 nodes) within a cluster, it must have 2 GB of RAM. Master consoles
after October 29, 2004 ship with 2 GB of RAM installed.
Questions about master console memory requirements should be directed to:
Virtualization One-Off Administrator/Raleigh/IBM@IBMUS
by your IBM sales representative.


40c155

In the event of a power failure, the UPSs provide temporary power

In the event of a power failure, the UPS pair provides temporary power


44c159,160
day that is convenient for the customer. Two UPSs are required to
day that is convenient for the customer.

UPSs are paired to


46c162,163
Each UPS requires a 220 V, 15 amp power source and must be protected by a
Each UPS in the UPS pair
requires a 220 V, 15 amp power source and must be protected by its own

48,152c165,172
provide added redundancy.

Power cords to connect the UPSs to a standard PDU ships standard with
the UPSs. If the UPSs will not be installed in a rack with a PDU, power
cords must be ordered with the UPSs to connect to an alternate power
source.
provide added redundancy. Two UPS pairs can share the two separate
circuits, but each UPS must be protected by its own 15 amp circuit
breaker.

One UPS pair (#8100) is required for one or two I/O Groups;
a second UPS pair is required for a three or four I/O Group SVC cluster.

Power cords to connect the UPSs to a standard PDU ship standard with
the UPSs. In addition, country-specific power cords must be ordered
for UPSs so they can be installed in a rack without a PDU.


61,162c181,183






alt="Back to top"/>Back to top

65c186,187

cellpadding="0" summary="layout">


72,173c194,196






alt="Back to top"/>Back to top

76c199,200

cellpadding="0" summary="layout">


98c222
to a maximum of four machines per SAN Volume Controller cluster.
to a maximum of eight machines per SAN Volume Controller cluster.

09,210c233,235






alt="Back to top"/>Back to top

13c238,239

cellpadding="0" summary="layout">


16c242,243

summary="layout">

18c245,246

alt="TOC Link"/>

21c249,250

alt="TOC Link"/>

24c253,254

alt="TOC Link"/>

28c258,259

alt="TOC Link"/>

31c262,263

alt="TOC Link"/>

57c389
Controller is four.
Controller is eight, configured in four I/O groups.

59,362c391,393
Pack for SAN Management or Bonus Kit for SAN Management.
The license for the IBM Tivoli Bonus Pack for SAN Management or
Bonus Kit for SAN Management applies to the enterprise
acquiring the SAN Volume
Pack for SAN Management or Bonus Kit for SAN Management. The license for
the IBM Tivoli Bonus Pack for SAN Management or Bonus Kit for SAN
Management applies to the enterprise acquiring the SAN Volume

82,387c413,419

The UPS requires two dedicated circuits, one for each of the
redundant UPSs. Each circuit must be protected by a 15 amp
circuit breaker and supply single-phase 220 volts at 50 to 60 Hz.
It is recommended that these be on separate circuits to provide added
redundancy in the system structure.

Power cords to connect the UPSs (feature number 8100) to a compatible

Each UPS in the UPS pair must be powered by a single-phase 220 volt,
15 amp, 50 to 60 Hz power source. It is recommended that these be on
separate circuits to provide added redundancy in the system structure.
If there are two UPS pairs in the SVC cluster,
they may share the two dedicated circuits, but each UPS must still be
protected by its own 15 amp circuit breaker.

Power cords to connect the UPSs (feature # 8100) to a compatible


92,593c624,626






alt="Back to top"/>Back to top

96c629,630

cellpadding="0" summary="layout">


14d647
Version 1, Release 1, VRM 1.1.0

34c667
Web by August 29, 2003. They can be downloaded from:
Web by October 29, 2003. They can be downloaded from:

03c736
---------------------------------------------------------- ---------
------------------------------------------------- ---------

07,708c740,742






alt="Back to top"/>Back to top

11c745,746

cellpadding="0" summary="layout">


14c749,750

summary="layout">

16c752,753

alt="TOC Link"/>

19c756,757

alt="TOC Link"/>

22c760,761

alt="TOC Link"/>

28,731c767,768

Power Cords


UPS


Power cords to connect the UPSs (feature number 8100) to a compatible
Power Distribution Unit (PDU) ship standard with the UPSs.

Power cords to connect the UPS pair(s) (feature number 8100) to a
compatible Power Distribution Unit (PDU), ship standard with the UPSs.


35,736c772,774
One of the following power cord Specify
Features is required to connect the UPSs to the alternate power source.
One of the following power cord Specify Features is required to connect
each UPS pair to the alternate power source. If two UPS pairs are
ordered, two country-specific power cord features must be ordered.

39,743c777,779
Hardware Requirements section.


Power cords are both Plant and Field installable.

 

Power Cord

Hardware Requirements section.

Power cords are both Plant and Field installable.

Power Cord

45c781
---------------------- ------- ----- -------
----------------------------- ------- ----- -------

64,774c800,810
Minimum number of features: None.
Maximum number of features: One.
Prerequisites: Feature #8100.
Corequisites: None.
Compatibility Conflicts: None.
Customer Setup: No.
Limitations: Only one UPS Power Cord feature may be
ordered for each machine.
Field installable: Yes.
Plant installable: Yes.

  • Minimum number of features: One.
  • Maximum number of features: Two.
  • Prerequisites: Feature #8100.
  • Corequisites: None.
  • Compatibility Conflicts: None.
  • Customer Setup: No.
  • Limitations: Only one UPS Power Cord feature may be
    ordered for each UPS pair.
  • Field installable: Yes.
  • Plant installable: Yes.


03c839
  • Maximum number of features: One.
  • Maximum number of features: Two.

    09c845
    machine.
    master console (#4001)

    51c887
  • Compatibility Conflicts: None.
  • Compatibility Conflicts: Mutually exclusive with feature #1724.

    74,925d909
    SAN Integration Server 2145 4F2 9298 Plant No
    (Integration Routing)
    UPS Power (Line) Cords
    Plant/
    Description Machine Model Feature Field CSU
    ----------------------------- ------- ----- ------- ------ ---
    UPS Power Cord - US/Canada 2145 4F2 9800 Both No
    (250V/15A - 2.5 m)
    UPS Power Cord - EMEA 2145 4F2 9820 Both No
    (250V/16A - 2.5 m)
    UPS Power Cord - Swiss, Liech 2145 4F2 9825 Both No
    (250V/16A - 2.5 m)
    UPS Power Cord - Thailand 2145 4F2 9827 Both No
    (250V/15A - 2.5 m)
    UPS Power Cord - S. Africa 2145 4F2 9829 Both No
    (250V/16A - 2.5 m)
    UPS Power Cord - Aust/NZ 2145 4F2 9831 Both No
    (250V/20A - 2.5 m)
    UPS Power Cord - Denmark 2145 4F2 9838 Both No
    (250V/16A - 2.5 m)
    UPS Power Cord - US/Chicago 2145 4F2 9986 Both No
    (250V/15A - 1.8 m)
    Master Console Power (Line) Cords
    Plant/
    Description Machine Model Feature Field CSU
    ---------------------- ------- ----- ------- ------ ---
    MC Power Cord (#1) 2145 4F2 9701 Both No
    U.S. 110 V 6'
    MC Power Cord (#2) 2145 4F2 9702 Both No
    Eur,Mid-East,Africa
    MC Power Cord (#3) 2145 4F2 9703 Both No
    Austral,N.Z.
    MC Power Cord (#4) 2145 4F2 9704 Both No
    Eur,S.Korea
    MC Power Cord (#5) 2145 4F2 9705 Both No
    Eur,Den
    MC Power Cord (#6) 2145 4F2 9706 Both No
    Pakistan,S.Africa
    MC Power Cord (#7) 2145 4F2 9707 Both No
    Switz,Liechtenstein
    MC Power Cord (#8) 2145 4F2 9708 Both No
    Chile,Italy,Ethiopia
    MC Power Cord (#9) 2145 4F2 9709 Both No
    Israel
    MC Power Cord (#10) 2145 4F2 9710 Both No
    US/Japan/S.America
    MC Power Cord (#11) 2145 4F2 9711 Both No
    Argentina
    MC Power Cord (#12) 2145 4F2 9712 Both No
    China
    MC Power Cord (#13) 2145 4F2 9713 Both No
    US 110 V, 9'

    69,971c953,955
    must be an odd number (one or three); when ordered to add to an existing
    cluster, the number must be even (two). This feature is plant installed
    only.
    must be an odd number (1, 3, 5, or 7); when ordered to add to an
    existing cluster, the number must be even (2, 4, or 6). This feature is
    plant installed only.

    91a976,981

    If the master console is used to manage more than two I/O Groups
    (4 nodes) within a cluster, it must have 2 GB of RAM. Master consoles
    after October 29, 2004 ship with 2 GB of RAM installed.
    Questions about master console memory requirements should be directed to:
    Virtualization One-Off Administrator/Raleigh/IBM@IBMUS
    by your IBM sales representative.


    99c989
  • Maximum number of features per Model 4F2: One.
  • Maximum number of features per Model 4F2: Two.

    021a1012,1013
  • Maximum number of features per Model 4F2: Eight if two master
    console features (#4001) are included in the order.

    041a1034,1035
  • Maximum number of features per Model 4F2: Eight if two master
    console features (#4001) are included in the order.

    061a1056,1057
  • Maximum number of features per Model 4F2: Eight if two master
    console features (#4001) are included in the order.

    081a1078,1079
  • Maximum number of features per Model 4F2: Eight if two master
    console features (#4001) are included in the order.

    093,1094c1091,1092
    each SAN Volume Controller. It must be included in the order for
    the first SVC Storage Engine of each and every SAN Volume Controller
    each SAN Volume Controller. This feature must be included in the order
    for the first SVC Storage Engine of each and every SAN Volume Controller

    097,1113c1095,1113
    Each UPS includes power (line) cords that will connect
    the UPS to a rack power distribution unit (PDU).
    Optional country-specific power cords,
    specified by feature number, may also be included in
    the initial SVC Storage Engine order if a PDU is not used.

    Minimum number of features per Model 4F2: None.
    Maximum number of features per Model 4F2: One.
    Prerequisites: Feature number 3001.
    Corequisites: None.
    Compatibility Conflicts: Mutually exclusive with
    Feature #3002.
    Customer Setup: No.
    Limitations: None.
    Field installable: Yes.
    Plant installable: Yes.

    One UPS pair (#8100) is required for one or two I/O Groups;
    a second UPS pair is required for a three or four I/O Group SVC cluster.

    Each UPS pair includes power (line) cords that will connect
    the UPS pair to a rack power distribution unit (PDU).
    Country-specific power cords, specified by feature number, must also
    be included in the order for each UPS pair ordered.


    • Minimum number of features per Model 4F2: One on the initial order;
      None on an MES order.
    • Maximum number of features per Model 4F2: Two on the initial order;
      one on an MES order.
    • Prerequisites: Feature #3001 on the initial order.
    • Corequisites: One country-specific power cord (#98xx).
    • Compatibility Conflicts: None.
    • Customer Setup: No.
    • Limitations: Maximum of two #8100 per SVC.
    • Field installable: Yes.
    • Plant installable: Yes.


    117,1118c1117,1119






    alt="Back to top"/>Back to top

    121c1122,1123

  • cellpadding="0" summary="layout">


    127,1128c1129,1131






    alt="Back to top"/>Back to top

    131c1134,1135

    cellpadding="0" summary="layout">


    135,1136c1139,1141






    alt="Back to top"/>Back to top

    139c1144,1145

    cellpadding="0" summary="layout">


    152a1159,1161


    alt="Back to top"/>Back to top